In Progress

Ad Majorem: The Campaign for Jesuit Dallas includes capital projects that reinforce our investment in the individual academic, spiritual, and emotional needs of each student. As part of the most ambitious construction effort in the history of our campus, we have set out to reinforce our faith identity, support the divergent academic needs of our students, and enhance the safety and security of the Jesuit campus.


 

[Front of School Modernization]

Rebuilding Jesuit’s front entrance modernizes the School’s façade and bolsters its visual appeal from the outside. Functionally, the expansion relieves congestion and improves traffic flow from drop off and pick up on campus, establishes new areas of support for current and prospective students, and prominently reinforces our faith identity.

  • Single Point of Controlled Front Entry Into Campus 
  • Enlarged Welcome and Reception Area
  • Admissions Commons
  • Nurses Station
  • Reimagined Hall of Honors
  • Historical Library Remodel

Target Construction Date: 2024

Front of School Expansion

Front of School Entrance

Front of School Entrance

Covered Entrance

Front Reception

Admissions Commons

Nurses Station

Historical Library Remodel

Historical Library Remodel

Historical Library Remodel

Front of School Entrance

Front of School Entrance

[Chapel Expansion]

Core to our mission, Jesuit students are called to proclaim their faith, promote justice, and foster a relationship with Christ as a model for adult living. The new chapel immediately becomes our most distinguished architectural feature and provides our students with the space they need to invite God into all of their experiences, strengthen their understanding of who they are, and who God is calling them to be.

  • Covers over 4,000 square feet and will be recognizable from the Dallas North Tollway
  • Seating for over 350 individuals
  • Spiritual reflection areas
  • Stations of the Cross
  • Healing memorial for victims of abuse
  • Separate sacristy and pipe organ areas

Target Construction Date: 2024

[Student Support & Learning Resource Center]

The signature element in Jesuit’s front-of-school rebuild establishes a centralized learning space on campus that creates conditions for optimizing student learning and maximizing the academic talents of our high achieving students. Connecting to the guidance and counseling wing and providing sustained access to faculty, counselors, and learning resource professionals, the new build out facilitates the convergence of academic growth and student wellness.

  • 4,000 square foot Learning Resource Center commons configured to support various modalities
  • Dedicated working labs for math and writing
  • Publications lab
  • Expanded testing center
  • Breakout rooms for individual and small-group study

Target Construction Date: 2024

Learning Resource Center

Learning Resource Center

Math Lab

[Dove Fieldhouse]

Spurred by a wonderfully generous lead gift by Jenny and Tim Dove ’75, the Dove Fieldhouse is a 26,000-square foot, two-story multi-use center that offers innovative solutions for sport-specific training throughout the year and provides an indoor training home for golf, crew, wrestling, and cycling. The state-of-the-art facility is adjoined by two full-sized practice fields. 

  • Golf training room with simulation bays and a putting and chipping area
  • Indoor rowing tanks with data analytics
  • Dedicated practice facilities for wrestling and cycling
  • Locker rooms for Jesuit Dallas Lacrosse and Rugby
  • Two full-sized turf fields, with viewing from an observation deck

Target Completion Date: Summer 2023 (Fieldhouse); Fall 2023 (South Campus Practice Fields)  

Dove Fieldhouse

South Campus Practice Fields

Indoor Rowing Tank

Indoor Rowing Machines

Indoor Golf Training Room

Wrestling Gym

Cycling Room

Observation Deck